The project consisted of a diagnostic imaging room, patient holding area, physician and staff support areas, utility and storage rooms. The project was designed to update Community Medical Center’s existing cardiac catheterization program. The new department is equipped with state-of-the-art technology essential to meet the continuing needs of the growing population of Ocean County. Work was performed as owner continued to occupy portions of the existing building during the entire construction of the 4 Phases.
New cardiac catheterization suite includes:
• Diagnostic imaging room
• Control room
• Patient holding area
• Clean utility room
• Soiled utility room
• Stock room
• Patient changing and locker area
• Staff lounge
• Physician reading area
• Office space |